Concrete seawall and angled support piles at the waterline, with a band of barnacles
Delray Beach, FL · Palm Beach County

Seawall Cleaning & Dock Piling Cleaning in Delray Beach, FL

Seawall cleaning in Delray Beach is diver work. We get in the water at your Intracoastal dock and take the growth off the wall and every piling, so you can see both again.

Delray Beach, FL

Seawall and dock piling cleaning along Delray Beach's Intracoastal

A diver works along your wall and around each dock piling, from the waterline down. Off come the oysters, the barnacles and the algae. When the surface is bare, the diver looks it over for damage or erosion.

Delray Beach has a seawall height rule, and it is not only for City property. A City report from July 2026 says the seawall ordinance requires public and private walls at a minimum of 4.2 feet NAVD88. Delray Beach's own project is meant to bring City walls up to that mark. Cleaning does not make a wall taller. It shows you the wall you have.

We wrap dock pilings as well as clean them. Have two numbers ready when you call: the wall's length and the piling count.

Barnacle growth on a concrete dock piling at the waterline
  • Delray Beach's seawall minimum is 4.2 feet NAVD88, on public and private walls.
  • Delray Beach's own seawall project: eleven replacements, five repairs.
  • Marine Way's failed seawall runs from the Atlantic Avenue Bridge to SE 1st Street.

Local notes for Delray Beach

The 4.2-foot minimum reaches private seawalls too

A City of Delray Beach report dated July 14, 2026 states the rule. The seawall ordinance requires both public and private seawalls at a minimum elevation of 4.2 feet NAVD88. So the rule reaches the wall behind a house, not only City property. With the growth off, you or an engineer can see the face of that wall.

City of Delray Beach, seawall project agenda report, July 14, 2026

Eleven City walls replaced, five repaired: Delray Beach's own project

The same report describes the City's Seawall Replacement and Repair Project. Its scope is the full or partial replacement of eleven City seawalls and the repair or enhancement of five, with Mangrove Park among the sites. That is the City looking after its walls. For a private wall and the pilings under your dock, the cleaning is work we do.

City of Delray Beach, Seawall Replacement and Repair Project scope, July 14, 2026

Marine Way: a failed seawall with a replacement planned

The City's March 26, 2026 report says the seawall along Marine Way has failed between the Atlantic Avenue Bridge and SE 1st Street. The proposed project includes a new seawall with a higher cap elevation and drainage improvements. If your dock is near Marine Way, tell us where, and whether you want the wall, the pilings or both cleaned.

City of Delray Beach, Marine Way project agenda report, March 26, 2026

  • Oysters and barnacles around the base of a concrete piling at the waterline
  • Dock piling with an exposed surface, a fender and dive hose
  • Concrete pilings and a seawall under a dock, with barnacles and green algae at the waterline

Seawall & Dock Cleaning questions in Delray Beach

Does Delray Beach's seawall height rule apply to private walls?

Yes, Delray Beach's seawall height rule covers private walls as well as public ones. The City's July 14, 2026 report says the ordinance requires both at a minimum of 4.2 feet NAVD88. An engineer or marine contractor can tell you how your wall measures against it. We can clean the wall before they look.

Is the City replacing the seawall on Marine Way?

Yes, the City of Delray Beach has a project to replace the failed seawall on Marine Way. Its March 26, 2026 report puts the failed stretch between the Atlantic Avenue Bridge and SE 1st Street. The plan is a new wall with a higher cap, plus drainage improvements. We clean private seawalls and dock pilings along the same Intracoastal shore.

Can you do the dock pilings while you are cleaning the seawall in Delray Beach?

Yes, our divers clean the dock pilings and the seawall in Delray Beach, and we wrap pilings too. Delray Beach docks sit on the Intracoastal Waterway, and that is where the diver gets in. Count the pilings before you call. That number and the footage of wall tell us the size of the job.

Is 6 Feet Under licensed and insured for dock work in Delray Beach?

Yes, 6 Feet Under is a licensed and insured dive service. We are a crew based in Fort Lauderdale, and we cover the coast from Jupiter down to Miami. Delray Beach sits inside that run, so our divers come to your dock on the Intracoastal.

What should I have ready when I call about a seawall in Delray Beach?

Have three things ready: how long the wall is, a piling count and the spot on the Intracoastal where the property sits. In Delray Beach the nearest bridge is a quick way to say it: George Bush Boulevard, Atlantic Avenue or Linton Boulevard. Say too whether you want the pilings wrapped after they are cleaned.

Call nowGet a Free Quote